Township of Lamar (Clinton County) (PA)

Pennsylvania Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedYes

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRICAL CODE

IEBC Accepted
Yes
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
Yes

Structural & loads

Wind Speed
90
Snow Load
35
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
No
Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Township of Lamar (Clinton County) (PA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.