City of Newport (RI)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2019 RHODE ISLAND BUILDING CODE 2019 RHODE ISLAND RESIDENTIAL CODE 2019 RHODE ISLAND FIRE CODE 2019 RHODE ISLAND PLUMBING CODE 2019 RHODE ISLAND MECHANICAL CODE 2019 RHODE ISLAND ENERGY CODE 2019 RHODE ISLAND ADMINISTRATIVE CODE 2019 RHODE ISLAND ELECTRICAL CODE 2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
SE / EE digital stamps on all PV pages 1-7a & PE Letters / Calcs.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 140
- Wind Notes
Exposure Category C. Wind-borne debris region.
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 130mph. Exposure Category C. Wind-borne debris region. SL: 30psf **Inspector states he would "would like to see the "solid neutral" passing thru with no connection to the enclosure, and the equipment ground connected to the enclosure. Often the install crew has no idea what to do with these conductor/connections and the bond screw. I try to avoid "conductors in parallel" with the neutral and equip ground."**
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Master Plan Set combining all individual projects into one plan set showing all panels/systems/etc if a project has multi-system job
- Electrical Diagram
**For SLD** Show AC Disconnect details ie: lines to/from top and bottom of disconnect **For PV Breaker Tie in** GEC from Disco/PM to MSP in conduit **For lineside taps** From Disco/PM to msp - "#6 GEC bare copper, free air bonded existing uffer tie in"
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim