County of Dorchester (SC)

South Carolina Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedYes

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL FUEL GAS CODE

2020 NATIONAL ELECTRICAL CODE

2009 INTERNATIONAL ENERGY CONSERVATION CODE (ENERGY STANDARD ACT)

IEBC Accepted
Yes
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
Yes
Rough Inspection
None
New Planset Required For Module Swap
Yes

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Top Right
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
Yes
Setback Notes

Standard

Structural & loads

Wind Speed
140
Wind Notes

Exposure Category C

Snow Load
5
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes

AHJ needs all pages of plans stamped.

Plans and calcs must be stamped by the same engineer.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Line Side Taps,Load Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Plans must be 11x17, and drawings should fit the page correctly. ALL Pages need to be stamped including the first one.

Electrical Diagram

Designers please follow SLD example provided by Dominion Energy (SC) and include the CO-GEN production meter socket.

Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
No
Setback Front Yard
5
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Dorchester (SC) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.