County of Greenville (SC)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL FUEL GAS CODE
2020 NATIONAL ELECTRICAL CODE
2009 INTERNATIONAL ENERGY CONSERVATION CODE (ENERGY STANDARD ACT)
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Not accepted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
The Site and Line Drawing need to be sealed and signed by an electrical engineer.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 10
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
AHJ requires "Eyes on Letter" which is a statement including roof structural components and condition. The statement is to reflect the existing condition of the structure and the dimensions and spacing of the members. Letter can't include that the observation was performed by the installer or mention photos. The EOL does not need to be stamped but signed, printed name, and date by person issuing the EOL.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
AHJ Requires "Eyes on letter" Please see file section for example. Please see Structural Notes in AHJ for further details.
- Electrical Diagram
Make sure that AC Disconnect is clearly labeled. DO NOT call out as generator disconnect switch(per DCR of Christmas, Leigh)
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim