Town of Cheraw (SC)

South Carolina Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2020

Codes

NEC Code Version
2020
Code List

2021 SOUTH CAROLINA BUILDING CODE (2021 IBC)

2021 SOUTH CAROLINA RESIDENTIAL CODE (2021 IRC)

2021 SOUTH CAROLINA FIRE CODE (2021 IFC)

SOUTH CAROLINA MECHANICAL CODE (2021 IMC)

SOUTH CAROLINA FUEL GAS CODE (2021 IFGC)

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL FUEL GAS CODE

2009 INTERNATIONAL ENERGY CONSERVATION CODE (ENERGY STANDARD ACT)

2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
New Planset Required For Module Swap
No

Structural & loads

Reducible Snow Load Allowed
Yes
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Cheraw (SC) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.