Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Holly Hill (SC)

South Carolina Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020

Codes

NEC Code Version
2020
Code List

2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL FUEL GAS CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE 2021INTERNATIONAL EXISTING BUILDING CODE 2021 INTERNATIONAL SWIMMING POOL AND SPA CODE 2020 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Structural & loads

Wind Speed
131
Snow Load
10
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Holly Hill (SC) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.