City of Aledo (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Fire Code Version2015 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2014
Fire Code Version
2015 Building Code
Code List

2015 International Residential Code

2015 International Plumbing Code

2015 International Mechanical Code

2015 Energy Conservation Code

2015 International Fire Code

2015 International Fuel Gas Code

2014 National Electrical Code

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

* 2012 IFC

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Site

## **Site:** _include the PV array layout in compliance with the local government design criteria including:_ * Roof plan showing location of equipment and, if required, fire setbacks * Existing site easements, property lines, building setback lines, zoning setbacks * Typical side view detail of the solar PV system mount on the roof * Location of all existing structure and proposal PV system equipment ( _including modules, disconnections, inverters, panel boards, combiner boxes, storage batteries, utility meters, etc.)_ * Plumbing vent termination: Vent termination is _not allowed_ under solar installations and must be relocated or modified, or an air admittance valve may be utilized in accordance with the IPC and/or IRC

Ground mount

Ground Mount Fencing Required
Mesh/Scrim