City of Justin (TX)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 International Building Code
2018 International Residential Code
2018 International Existing Building Code
2018 International Mechanical Code
2018 International Energy Conservation Code
2018 International Plumbing Code
2018 International Fire Code
2017 National Electrical Code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Post Install Letter Notes
Solar Panel Installation Letter Required
Before we can schedule the inspection, the City of Justin is requiring a Solar Panel Installation Letter: After solar panel installation has been completed, please provide a letter stating that the installation was performed to current building and electrical code standards and is signed by either a master electrician or an engineer.
The Letter will need to state that all electrical components have been installed per plans and meet the 2017 NEC/ 2018 IRC.
This will need both EE & PE stamps.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
StandardPost Install Letter Notes
Solar Panel Installation Letter Required
Before we can schedule the inspection, the City of Justin is requiring a Solar Panel Installation Letter: After solar panel installation has been completed, please provide a letter stating that the installation was performed to current building and electrical code standards and is signed by either a master electrician or an engineer.
The Letter will need to state that all electrical components have been installed per plans and meet the 2017 NEC/ 2018 IRC.
This will need both EE & PE stamps.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Roof Plan
Conduit, wiring systems, and raceways for photovoltaic circuits shall be located as close as possible to the ridge or hip or valley and from the hip or valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilation opportunities
- Attachment Detail
Residential structures shall be designed so that each photovoltaic array is no greater than 150 feet (45 720 mm) by 150 feet (45 720 mm) in either axis
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Post Install Letter Notes
Solar Panel Installation Letter Required
Before we can schedule the inspection, the City of Justin is requiring a Solar Panel Installation Letter: After solar panel installation has been completed, please provide a letter stating that the installation was performed to current building and electrical code standards and is signed by either a master electrician or an engineer.
The Letter will need to state that all electrical components have been installed per plans and meet the 2017 NEC/ 2018 IRC.
This will need both EE & PE stamps.
Please see Files section for example of the above
Ground mount
- Ground Mount Fencing Required
- No