City of The Colony (TX)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 INTERNATIONAL BUILDING CODE
2024 INTERNATIONAL RESIDENTIAL CODE
2024 INTERNATIONAL MECHANICAL CODE
2024 INTERNATIONAL PLUMBING CODE
2024 INTERNATIONAL FUEL GAS CODE
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL FIRE CODE
2024 INTERNATIONAL EXISTING BUILDING CODE
2024 INTERNATIONAL SWIMMING POOL AND SPA CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
PE Requirements; C
Structural letter to reflect the 2021 IFC.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
1. Provide conductor ampacity calculations for EACH section of writing between equipment and indicate the conductor ampacity of each section of writing on the single line diagram.Per staff on 4/20/21 -NP
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Ground Mounts: Electrical components should comply with 2020 NEC. Building components should follow the same 2021 IBC guidelines as for an Accessory Structure (Setbacks - 3' from property lines, no fire setbacks) and does allow for easements. No engineer stamps are required for ground mounts.
- Setback Front Yard
- 3
- Setback Back Yard
- 3
- Setback Side Yard
- 3