City of South Ogden (UT)

Utah Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 EXISTING BUILDING CODE 2021 RESIDENTIAL PROVISIONS IN INTERNATIONAL ENERGY CONSERVATION CODE 2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
0
Rough Inspection
Footing inspection
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Wind load is to be based on 115 mph 3 second gust

Snow Load
43
Snow Load Notes

Ground snow load is to be based on 43 psf, and roof snow load is to be based on 30 psf.

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Utah does not want single panel arrays with railless systems. Please have layout changed if this happens example photo below Informational note from checklist: Mounting system: Provide detailed information on the module mounting system and also the weight of all components on the roof. The support manufacture specs must also specify the required support spacing based on the local wind and snow loads. Wind load is to be based on 115 mph 3 second gust, ground snow load is to be based on 43 psf, and roof snow load is to be based on 30 psf. Note if the home roof rafters are engineered trusses or provide information on the type and size of the roof rafters if they are other than engineered trusses. Also note the type of the roof covering (shingles, metal, or tile) and how many layers of the covering there are. If the racking system has integrated grounding/bonding, please also provide spec sheets showing such. Parcel search: wind speed - snow load

Site

Show all abutting streets

Attachment Detail

No single panel arrays

Electrical Diagram

ALL PROJECTS: SLD: One line diagram. Indicate if the string of modules are connected in series or parallel Please provide photos of the existing service panelboard and photos of its interior labels. Photos must be with the service panelboard’s front covers open and show the ratings of all breakers therein. The photos of labels must also clearly show the rating of the panelboard. These photos are always required for every solar PV plan submittal and are essential to determining if the requirements of NEC 705.12(A) or 705.12(B) are going to be met. PLEASE BE AWARE that additional plan review comments may be generated depending on what type of service panel it is and what condition it is in. In addition to the above noted comment, if the utility meter base is not part of the same panelboard as the service panelboard, please also provide photos of the meter base and the service conduit (with photos taken from about 5 to 10 feet or so away from the equipment). Please be aware that the line diagram must be drawn correctly based on the type of service panel that this home has. In other words, the layout of the service panel on the diagram must match that of the actual service panel. Generic layouts of service panels on the line diagram will not be accepted. MPUs: Clearly specify on the line diagram the exact model number of the service panel you are going to install and provide manufacturer specification sheets for such service panelboard. The layout of the service panel on the diagram must match that of the actual service panel

Label Page

* Include colored label page with Yellow and white coloring for "SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN" 690.56(C)(1). and other labels as red background with white lettering per past corrections from W3C. - add comment beneath label that it will be located within 3' of service panel. * A sign with the EXACT wording “Rapid Shutdown Switch for Solar PV System” must be provided next to the rapid shutdown disconnect for this system.

Label Page Notes

Signage cannot be hand-written. NEC 110.21(B)

Custom Placards Required
0
Non Standard Planset Requirements
Single Line Diagram
Non Standard Revision Requirements

Ahj requires photos of existing service panel

Ground mount

Ground Mount Fencing Required
Yes
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of South Ogden (UT) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.