City of Tenino (WA)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correction NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback EnforcedYes
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2023 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- No
- New Planset Required For Module Swap
- No
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- Yes
Structural & loads
- Snow Load Notes
https://hazards.atcouncil.org/#/
- Reducible Snow Load Allowed
- Yes
Electrical
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Supply Tap Neutral Ground Bond Required
- Yes
Plan set
- Plan Set Requirements
Electrical permits required from the State of Washington - Labor & Industries (WA). Please see page for requirements.
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP