City of Vancouver (WA)
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 97
- Wind Notes
Risk Occupancy Category (Table1604.5) 3-Second Gust Wind
- Snow Load
- 999
- Snow Load Notes
Ground Snow load up to 150 ft 20 psf
Ground Snow load over 150 ft 25 psf
Roof Snow load (regardless of slope) 25 psf Minimum
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
For all Trenches
- 2 Disconnects required - one at each end of trench
- Required for AC or DC trenches
- Cover Page
standard
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP
Ground mount
- Ground Mount Fencing Required
- No