County of Thurston (WA)
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 UNIFORM PLUMBING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL PERFORMANCE CODE FOR BUILDINGS AND FACILITIES
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL PROPERTY MAINTENANCE CODE
2021 WA STATE ENERGY CODE
2020 NATIONAL ELECTRICAL CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 97
- Snow Load
- 15
- Snow Load Notes
https://hazards.atcouncil.org/#/
- Reducible Snow Load Allowed
- 1
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
- Supply Tap Neutral Ground Bond Required
- 1
Plan set
- Plan Set Requirements
For all Trenches
- 2 Disconnects required - one at each end of trench
- Required for AC or DC trenches
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP
- Custom Placards Required
- 0