Township of Erin (WI)
NEC Code Version2017
Wet Stamps RequiredDigital Structural
Codes
- NEC Code Version
- 2017
- Code List
- WISCONSIN UNIFORM DWELLING CODE 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2017 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
Structural & loads
- Wind Speed
- 90
- Snow Load
- 35
- Reducible Snow Load Allowed
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim