Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

C & L Coop

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

For Net-Metering Customers who receive service under a rate that does not include a demand component, the Electric Utility shall credit a Net-Metering Customer with the amount of any accumulated Net Excess Generation as measured in kWh or kWh multiplied by the applicable retail rate in the next applicable billing period and base the bill of the Net-Metering Customer on the net amount of electricity as measured in kWh or kWh multiplied by the applicable retail rate that the Net-Metering Customer has received from or fed back to the Electric Utility during the billing period.


For Net Excess Generation credits older than twenty-four (24) months, a NetMetering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net-Metering Rules if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Generator capacity up to 25 kilowatts (or generator capacity representing the customer's highest residential usage in the previous twelve months)

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Contact the utility to schedule at least 3 days before

ext. 110

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Detail diagram of the Net Metering Facility

Install Reqs

Customer shall provide and install a meter socket for the Electric Utility's meter and any related interconnection equipment per the Electric Utility's technical requirements, including safety and performance standards.

Placards

Placard Sample in Plans Sample

Equipment Approvals
California Energy Commission
Website
link
Phone
(870) 628-4221

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
696352
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with C & L Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.