City of Siloam Springs

Arkansas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
Post Solar Billing Method
Feed-in-Tariff
Net Excess Generation Notes

The electric utility purchases all of the electricity generated from the customer’s renewable energy source (solar panels) at the same rate as what the electric utility purchases electricity from its wholesale provider, and all of the energy consumed by the customer is sold to the customer at the electric utility’s retail rate

Rebates Offered
No

Interconnection & taps

Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Siloam Springs before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.