Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Clay County Electric Cooperative (AR)

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Net Excess Generation Notes

Net Excess Generation shall be credited as described in 22.3.8 [Net Excess Generation shall first be credited to the Net Metering Customer’s meter to which the Net-Metering Facility is physically attached (Generation Meter).] and 22.3.9 [After application of 22.3.8 and upon request of the Net-Metering Customer pursuant to 22.3.11, any remaining Net Excess Generation shall be credited to one or more of the Net-Metering Customer’s meters (Additional Meters) in the rank order provided by the Net-Metering Customer.] during subsequent Billing Periods; the Net Excess Generation credits remaining in a Net-Metering Customer’s account at the close of a billing cycle shall not expire and shall be carried forward to subsequent billing cycles indefinitely. For Net Excess Generation credits older than twenty-four (24) months, a Net-Metering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the NetMetering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net-Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100). The Electric Utility shall purchase at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net-Metering Rules, any Net Excess Generation credits remaining in a Net-Metering Customer’s account when the Net-Metering Customer: 1) ceases to be a customer of the Electric Utility; 2) ceases to operate the Net-Metering Facility; or 3) transfers the Net-Metering Facility to another person. When purchasing Net Excess Generation credits from a Net-Metering Customer, the Electric Utility shall calculate the payment based on its Avoided Costs plus any additional sum determined under the Net Metering Rules for the current year. 

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

the greater of: 1) twenty-five kilowatts (25 kW) or 2) one hundred percent (100%) of the Net-Metering Customer’s highest monthly usage in the previous twelve (12) months for Residential Use

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Install Reqs

ALL equipment must be accessible 24/7

Equipment Approvals
Other
Rate Schedule Link
link
Website
link
Phone
(870) 892-5251

Other details

Restrict Inspection
1
Address ID
975361
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Clay County Electric Cooperative (AR) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.