Net Metering AllowedNo
NEM TypeN/A
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

For net metering facilities installed after September 29, 2024 (non-legacy net-metering), net metering customers will be given credit at the avoided cost of energy for any excess kWh fed back to the cooperative during the billing period.


For net metering facilities interconnected before September 30, 2024 (legacy net-metering), net metering customers are given full retail rate credit (1:1) for any excess kWh fed back to the cooperative during the billing period. Any excess kWh generated by the net metering facility will reverse the kWh on the electric meter.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

The net metering facility must have a generating capacity of no more than 25-kW or 100% of the highest monthly usage in the previous 12 months for residential use or 1,000-kW for any other use.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

Transformer Upgrades: This is part of the application review process. If required Forever can make a request for the cost estimate if you intend to pay for the necessary upgrades. If the upgrades will be the homeowners responsibility, they will need to call and request the cost estimate which would then be sent to them with instructions for payment.

Install Reqs


Equipment Approvals
California Energy Commission
Website
link
Phone
(800) 489-7405

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with First Electric Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.