First Electric Coop
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
For net metering facilities installed after September 29, 2024 (non-legacy net-metering), net metering customers will be given credit at the avoided cost of energy for any excess kWh fed back to the cooperative during the billing period.
For net metering facilities interconnected before September 30, 2024 (legacy net-metering), net metering customers are given full retail rate credit (1:1) for any excess kWh fed back to the cooperative during the billing period. Any excess kWh generated by the net metering facility will reverse the kWh on the electric meter.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The net metering facility must have a generating capacity of no more than 25-kW or 100% of the highest monthly usage in the previous 12 months for residential use or 1,000-kW for any other use.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
If a temporary disconnect of First Electric’s service is required for this installation, please have the homeowner call them to make this request. Homeowners will need to provide the date and approximate time that the disconnect is desired. If the name and phone number of the licensed electrician that will be on-site is available, please provide that information as well. This request should be made at least 2 days before the desired temporary disconnect. Cutting meter seals and/or the pulling of First Electric meters by anyone other than First Electric personnel can result in a tampering charge being applied to an account.
- Allowed Meter Adapter
- None
Plans & docs
- Electric Service Reqs
Transformer Upgrades : This is part of the application review process. If required Forever can make a request for the cost estimate if you intend to pay for the necessary upgrades. If the upgrades will be the homeowners responsibility, they will need to call and request the cost estimate which would then be sent to them with instructions for payment.
- Install Reqs
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (800) 489-7405
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 694625
- Express Planset Eligible
- Yes