OG&E - Oklahoma Gas & Electric (AR)

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

If the kWhs generated by the Net-Metering Facility and fed back to the Electric Utility during the Billing Period exceed the kWhs supplied by the Electric Utility to the Net-Metering Customer during the applicable Billing Period, the Electric Utility shall credit the Net-Metering Customer with any accumulated Net Excess Generation in the next applicable Billing Period. The Net Excess Generation credits remaining in a Net-Metering Customer’s account at the close of a billing cycle shall not expire and shall be carried forward to subsequent billing cycles indefinitely. For Net Excess Generation credits older than twenty-four (24) months, a Net-Metering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 100% offset or 25 kW (whichever is less)

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes

Plans & docs

SLD Reqs

The disconnect must also be installed between 48” and 66” from ground level and shall be capable of being padlocked open by OG&E personnel during emergencies and/or for equipment maintenance.


Customer shall provide and install a meter socket for the Electric Utility's meter

Placards


Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link

Other details

Restrict Inspection
0
Revision Required
1
Address ID
1075842
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with OG&E - Oklahoma Gas & Electric (AR) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.