Net Metering AllowedNo
NEM TypeN/A
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

For Net-Metering Customers who receive service under a rate that does not include a demand component, the Cooperative shall credit a Net-Metering Customer with the amount of any accumulated Net Excess Generation as measured in kWh or kWh multiplied by the applicable retail rate in the next applicable billing period and base the bill of the Net-Metering Customer on the net amount of electricity as measured in kWh or kWh multiplied by the

applicable retail rate that the Net-Metering customer has received from or fed back to the Cooperative during the billing period.

Net excess generation shall first be credited during subsequent Billing Periods; the Net Excess Generation credits remaining in a Net-Metering Customer’s account at the close of a billing cycle shall not expire and shall be carried forward to subsequent billing cycles indefinitely. For Net Excess Generation credits older than twenty-four (24) months, a NetMetering Customer may elect to have the Cooperative purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Cooperative’s Avoided Cost plus any additional sum determined under the Net Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100.)

When purchasing Net Excess Generation credits from a Net-Metering Customer, the Cooperative shall calculate the payment based on its Avoided Costs plus any additional sum determined under the Net Metering Rules for the current year.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The net metering facility must have a generating capacity of no more than 25-kW or 100% of the highest monthly usage in the previous 12 months for residential use or 1,000-kW for any other use.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Diagram showing the configuration of all generating facility equipment, including protection and control schemes.

Equipment Approvals
California Energy Commission
Website
link
Phone
(870) 833-2915

Other details

Revision Required
Yes
Mod Swap Requires Planset