Ozarks Electric Cooperative
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Value Notes
- On a monthly basis, the Net-Metering Customer shall be billed the charges applicable under the currently effective standard rate schedule and any appropriate rider schedules. Under Net-Meteri
- Net Excess Generation Notes
If the electricity generated by the net metering facility is fed back to the cooperative and exceeds the electricity supplied by the cooperative during the billing period, then the member will receive a kWh credit for the accumulated net excess kWh to apply to next month’s bill. Credits may accrue from month to month and do not expire. The member will not receive a special bill. The kWh credit will be maintained in Ozarks Electric’s billing system. The monthly availability charge and minimum bill still apply even if no electricity is purchased from Ozarks Electric.
- Rebates Offered
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Size Justification
- Load Justification
- System Offset Notes
- An 8760 report (LJF) is required on all jobs.. Must show calcs for consumption of home and production of system.
- The net metering facility must have a generating capacity of no more than 25-kW or 100% of the highest monthly usage in the previous 12 months for residential use or 1000-kW for any other use.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Site Plan Reqs
Disconnect be mounted within 3 feet or less of Service Meter, if MSP is a meter/main combo, the UM still needs to be indicated on site plan
- SLD Reqs
AC Disco must be 3' or less from the UM
- Website
- link
- Phone
- (800) 521-6144