Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Ozarks Electric Cooperative

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Value Notes
On a monthly basis, the Net-Metering Customer shall be billed the charges applicable under the currently effective standard rate schedule and any appropriate rider schedules. Under Net-Meteri
Net Excess Generation Notes

If the electricity generated by the net metering facility is fed back to the cooperative and exceeds the electricity supplied by the cooperative during the billing period, then the member will receive a kWh credit for the accumulated net excess kWh to apply to next month’s bill. Credits may accrue from month to month and do not expire. The member will not receive a special bill. The kWh credit will be maintained in Ozarks Electric’s billing system. The monthly availability charge and minimum bill still apply even if no electricity is purchased from Ozarks Electric.

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes
  • An 8760 report (LJF) is required on all jobs. There is an example of this report in the files section. Must show calcs for consumption of home and production of system.
  • The net metering facility must have a generating capacity of no more than 25-kW or 100% of the highest monthly usage in the previous 12 months for residential use or 1000-kW for any other use.
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Site Plan Reqs

Disconnect be mounted within 3 feet or less of Service Meter, if MSP is a meter/main combo, the UM still needs to be indicated on site plan

SLD Reqs

AC Disco must be 3' or less from the UM

Website
link
Phone
(800) 521-6144

Other details

Restrict Inspection
1
Address ID
806884
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Ozarks Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.