Paragould Light Water and Cable

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.0513
Solar Export Value Notes
As of 06/2022
Net Excess Generation Notes

PLWC will credit at PLWC’s Avoided Cost rate the value of all electricity generated by a residential or non-demand billed Net-Metering Customer and fed back to PLWC. If the amount of credit exceeds the customer’s energy charges during the applicable Billing Period, PLWC will apply the excess credit in the next Billing Period.

On January 31st of each year, Net Excess Generation Credits earned during the previous year and remaining in a Net-Metering Customer’s account expire.

PLWC shall not provide generation credit to any Distributed Generation Customer with a delinquent account or that ceases to consume electricity.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs
  • A visibly open, lockable, manual disconnect switch which is clearly labeled and accessible by PLWC at all hours.
SLD Reqs
  • A visibly open, lockable, manual disconnect switch which is clearly labeled and accessible by PLWC at all hours.
Website
link
Phone
(870) 239-7700

Other details

Mod Swap Requires Planset
1
Address ID
1289074
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Paragould Light Water and Cable before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.