Petit Jean Coop

Arkansas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Supply Side Taps AllowedNo
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

For Net-Metering Customers who receive service under a rate that does not include a demand component, the Electric Utility shall credit a Net-Metering Customer with the amount of any accumulated Net Excess Generation as measured in kWh or kWh multiplied by the applicable retail rate in the next applicable billing period and base the bill of the Net-Metering Customer on the net amount of electricity as measured in kWh or kWh multiplied by the applicable retail rate that the Net-Metering Customer has received from or fed back to the Electric Utility during the billing period.

Net Excess Generation shall be credited as described in 27.3.8 and 27.3.9 during subsequent Billing Periods; the Net Excess Generation credits remaining in a Net-Metering Customer’s account at the close of a billing cycle shall not expire and shall be carried forward to subsequent billing cycles indefinitely. For Net Excess Generation credits older than twenty-four (24) months, a NetMetering Customer may elect to have the Cooperative purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Cooperative’s Avoided Cost plus any additional sum determined under the Net Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Tap Criteria

Line/Load side taps must use Polaris Connectors. This Utility will not accept piercing taps.

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Generator capacity up to 25 kilowatts (or generator capacity representing the customer's highest residential usage in the previous twelve months)

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs

Customer shall provide and install a meter socket for the Electric Utility's meter and any related interconnection equipment per the Electric Utility's technical requirements, including safety and performance standards

Equipment Approvals
California Energy Commission
Website
link
Phone
(501) 745-2493

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Petit Jean Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.