ED2 - Electrical District No.2
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Include the street address, arrangement of the major equipment, including the electrical service entrance section and ED2 meter, location of generator and interface equipment, and the location of the disconnect switch.
- SLD Reqs
For Existing System:
- If there's an existing PV system, both new and existing system will need to pass through the same production meter.
- PV plans need to show the complete system
- Electric Service Reqs
System size - sister company with Hohokam
The Cap size limit for PV is 10kW DC regardless of customer annual usage.
- Meter Num Req SLD 3LD
- 1
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (520) 723-7741
Other details
- Restrict Inspection
- 0
- Address ID
- 108057
- Express Planset Eligible
- No