ED3 - Electrical District No.3
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Residential cap size limit for PV is 10kW DC generation capacity
Small General service/commercial customers cap size limit for PV is 20kW DC
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
The utility disconnect shall not locate behind the gate
- SLD Reqs
- Bill holder name must be listed on Plans.
- Please attach a detailed one-line or three-line diagram of the proposed facility, all applicable elementary diagrams, /major equipment (generators, transformers, inverters, circuit breakers, protective relays, etc.) In addition, include all specifications, such as AC disconnect and rating, breaker sizes, wire and inverter sizes, grounding, production meter socket (meter supplied by customer), and subpanel with load center breaker sizes, and/or any other applicable drawings or documents necessary for the proper design of the interconnection.
Battery
- Utility will reject the plans if wire size does not match what is installed in the field. Per the AZ Branch Production Manager, we install the AWG 8 (Wire Size (4) on the Conduit Schedule) for ALL battery systems.
- Please make sure the Wire size from DER storage disco to DER storage mtr shows (4)AWG 8.
- A separate disconnect for the battery is required
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- 520 - 424- 9021; 520 - 424 - 0418
Other details
- Restrict Inspection
- 0
- Address ID
- 108060
- Express Planset Eligible
- No