GCEC - Graham County Electric Cooperative Inc
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
- All kWh received from the customer by the Cooperative (Excess Generation) will be credited on the monthly customer bill by the Cooperative at the Arizona Corporation Commission (ACC) approved AER.
- The credit shall be applied against the Cooperative monthly charges. No Excess Generation shall be “banked,” “saved” or “rolled forward” for use in a future month.
- In the event the credit exceeds the amount due the Cooperative (Excess Credits), the credit shall be rolled forward and applied against subsequent Cooperative bills until used.
- Rebates Offered
- 1
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 125
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 36
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
If no peak usage (residential/small business)
- Take the highest 12-month kWh usage from the past 3 years.
- Divide by 2190 to find 100% capacity (kW).
- Multiply by 125% for the allowed system size.
If peak usage exists
- Use 125% of the highest demand in the most recent 12 months.
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Meter Spot Required
- 1
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- The AC disconnect must be within 6’ of the utility meter and main. The distance must be shown on the site plan.
- SLD Reqs
- Electric Service Reqs
- Placards
Disconnect Switch
- Label as “Interconnected Utility Disconnect Switch” or “[System Type] Utility Disconnect Switch” (e.g., Photovoltaic Inverter Utility Disconnect Switch).
- Label must be on a permanent placard with clear, durable lettering.
Breaker Panels
- Customer must label all panels or devices that can be back-fed by the generator, per National Electric Code.
- The Utility will label any of its own equipment.
Service Entrance
- Place a sign at the service entrance showing the type and location of any onsite emergency, standby, or optional power sources as defined by the Utility.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (928) 485-2451
Other details
- Restrict Inspection
- 0
- Address ID
- 108141
- Express Planset Eligible
- Yes