MEC - Mohave Electric Cooperative

Arizona Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Net Excess Generation Notes

Export Rate 2023: $0.05700 / kWh

Rebates Offered
Yes
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
125
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

125%

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Three Line Diagram required

Electric Service Reqs

** System size - The customer’s 125% total connected load limit shall be determined:


a. In the absence of demand data (for residential and small business) the highest 12 months (Calendar Year) kWh consumption in the previous three years will be divided by 2190 (to determine the 100% capacity level in kW which will achieve a “net zero” home or business) and multiplied by 125%


b. For customers with a demand history it will be 125% of the highest demand in the most current 12 month period

Install Reqs

The system and installation must meet the requirements of all federal, state and local building codes and have been successfully inspected by the building official having jurisdiction. To do so, the installation must be completed in accordance with the requirements of the latest edition of the NEC in effect in the jurisdiction where the installation is being completed, including, without limitation, Sections 200-6, 210-6, 23070, 240-3, 250-26, 250-50, 250-122, all of Article 690 pertaining to photovoltaic systems, thereof, all as amended and superseded.

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
928-763-4115

Other details

Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with MEC - Mohave Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.