Navopache Electric Cooperative
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.041662
- Solar Export Value Notes
- AER will change as needed. Current value is from Dec 1, 2022.
- Net Excess Generation Notes
A. All kWh delivered by the Cooperative to the Customer during a billing cycle will be billed at the Cooperative' s applicable Standard Rate Schedule for the service provided to the Customer.
B. All kWh received from Customer by the Cooperative (Excess Generation) will be credited on the monthly customer bill by the Cooperative at the ACC approved AER or, if less than the AER, the energy charge paid by Customer to the Cooperative, adjusted by the applicable purchased power and fuel cost adjustor. The credit shall be applied against the Cooperative monthly charges. No Excess Generation shall be "banked," "saved" or "rolled forward" for use in a future month. In the event the credit exceeds the amount due the Cooperative (Excess Credits), the credit shall be rolled forward and applied against subsequent Cooperative bills until used. After the customer's December bill, a customer may request a compensation for any outstanding credits from the prior year; if the outstanding credits exceed $25, a check will be automatically issued, otherwise the bill credits will carry forward to the following year.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 125
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
10 kW DC for residential or 125% offset (whichever is less)
125% Max Sizing Calculation: In the absence of demand data (for residential and small business) the highest 12 months (Calendar Year) kWh consumption in the previous three years will be divided by 2190 (to determine the 100% capacity level in kW which will achieve a “net zero” home or business) and multiplied by 125%. For customers with a demand history it will be 125% of the highest demand in the most current 12 month period.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Situational
- Production Meter Criteria
Only required if REQUESTED
- Production Meter Position
- Inv-PM-Disco-POI
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Single line and 3 line diagram - Sent whole plan sheet(they need spec)
Utility DOES NOT accept lineside taps
GTE BATTERY
**EFFECTIVE 02/27/20:** Utility will reject the plans if wire size does not match what is installed in the field. Per the AZ Branch Production Manager, we install the AWG 8 (Wire Size (4) on the Conduit Schedule) for ALL battery systems.
**Please make sure the Wire size from DER storage disco to DER storage mtr shows (4)**** ****AWG 8.**
- Install Reqs
Effective November 1, 2023
Maximum Size Solar Allowed om Single Phase Panels:
1. 100A - 3.84kW
2. 200A - 7.68
a. De-rated Main Breaker to 175A would Allow up to 12.5kW
3. 320A - 12.3kW No De-Rate Allowed
4. 400A (Instrument Rated) - 15.3kW No De-Rate Allowed
5. 600A (Instrument Rated) - 23.0kW No De-Rate Allowed
ALL Calculations are based on National Electric Code (NEC) 120% max rating.
Section 705.12 (B)(2)(3)
- Placards
- AC Disconnect switch shall be clearly labeled: stated “DG Service Disconnect.”
- Disconnect switch will comply with NEC 690.15 and has a sign reading: “WARNING - ELECTRIC SHOCK HAZARD.•DO NOT TOUCH - TERMINALS ON BOTH THE LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION” has been installed.
- Circuit Breakers in the member’s distribution panel shall be labeled “PHOTOVOLTAIC POWER SOURCE” per NEC 705.10 and “BREAK-ERS ARE BACKFED” per NEC 690.64(b)5.
- The PV array safety DC disconnect will be marked with PV source ratings per NEC 690.53. (1)Operating Current(2)Operating Voltage(3)Maximum System Voltage(4)Short-circuit Current(5)Labeled “PV ARRAY DC SAFETY DISCONNECT”
- Optional: The solar output meter, to be supplied and installed by contractor, between the inverter and system disconnect switch and shall be labeled: “PHOTOVOLTAIC SYSTEM KWH METER.”
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 1
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
-For Enphase jobs please remove the comm wire from line diagrams.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (928) 368-5118
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 108071
- Express Planset Eligible
- No