Ocotillo Water Conservation District
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Value Notes
- Exported kWh will not be credited or banked.
- Net Excess Generation Notes
March 2023:
Energy generated will be consumed instantaneously, excess energy will not be banked or be credited. System can be set as non-export or export (with no credit) just need to ensure that the system will be installed exactly what was permitted/inspected.
June 2023:
Pending solar program, depending on what their "solar program" is we may or may not need to do a brand new research once it's completed.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
No specific system size requirement as long as it doesn't affect the utility's distribution system. Recommended maximum system size is 10 kW AC
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Rate Schedule Link
- link
- Website
- link
- Phone
- (480) 610-8756
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 2589237
- Express Planset Eligible
- Yes