Page Utility Enterprises
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The Customer shall compensate PUE each billing cycle for the metered ‘net energy’ as defined in paragraph 4.10. The compensation for ‘net energy’ shall be at the applicable rates as set by Page City Council. If Minus kilowatt hours are greater than the Positive kilowatt hours during the billing cycle, the surplus Minus kilowatt hours are forfeited by the Customer.
This interconnection agreement between PUE and the Customer is solely intended to Net Energy only, and at no time will the Utility reimburse the customer with cash or other valuable consideration for Minus kilowatt hours of energy from the Customer’s GF.
4.8 Minus Kilowatt Hours: Minus kilowatt hours are the kilowatt hours of energy flowing from the customer’s GF onto PEU distribution system.
4.9 Positive Kilowatt Hours: Positive kilowatt hours are the kilowatt hours of energy flowing from PUE’s distribution system into the customer’s system.
4.10 Net Kilowatt Hours: Net kilowatt hours are the difference of kilowatt hours of Positive kilowatt hours and Minus kilowatt hours.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- See SLD sample.
Production Meter is required.
- Install Reqs
- Production Meter is required.
A visible gang operated load break disconnect switch (“Disconnect Switch”), capable of being locked in a visibly “open” position by a standard PUE padlock that will completely isolate the GF from the PUE system.
PUE will not install and maintain any lines or equipment on Customer’s side of the Point of Interconnection except possibly its meter and some research equipment.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (928) 645-2419
Other details
- Restrict Inspection
- 0
- Address ID
- 651476
- Express Planset Eligible
- Yes