SCIP - San Carlos Irrigation Project
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Non-export
- Solar Export Type
- N/A
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Tap Criteria
Line side taps are not allowed in this Utility.
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
System size:
10 kW DC The limit applies for all projects (PV-only and PV+battery)
Metering & disconnect
- Production Meter Required
- No
- Meter Spot Process
The customer has to call them at and request the NEM/ Solar Agreement or they can and the NEM will be emailed to the customer only. They will only accept the original signed application that is sent to the customer.
Email plans to Art Johnson at
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
- Utility meter labeling to show as (SCIP Utility Meter)
GTE BATTERY
- Utility will reject the plans if wire size does not match what is installed in the field.
- Please make sure the Wire size from DER storage disco to DER storage mtr shows (4) AWG 8.
- Placards
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (520) 723-6253
Other details
- Restrict Inspection
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 108064
- Express Planset Eligible
- Yes