AEC - Anza Electric Cooperative
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0819
- Solar Export Value Notes
- This cost consists of the average cost of kWh purchased less AB32 charges less the cost of transmission.
- Net Excess Generation Notes
The excess kWh generated by the DG facility will be purchased at avoided cost.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 5
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Generating facility nameplate rating is limited as follows:
• Rate Schedule DG-1 and DG-2: Maximum of 5 KW DC or 100% offset (whichever is less)
• Rate Schedule DG-10, DG-14 and DG-20: Maximum of 10 KW DC or 100% offset (whichever is less)
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- All equipment displayed
- Include spec sheets for junction boxes
- SLD Reqs
- Utility Meter must be displayed
spec sheets required for battery projects:
lug kit
back up load panel
PV system shutdown switch
- Install Reqs
Everything installed must match plans
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Rate Schedule Link
- link
- Website
- link
- Phone
- 951-763-4333
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- Yes