ALW - City of Azusa Light & Water Department
Net metering & export
- Net Metering Allowed
- 1
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Minimum Size: 1 kW
Maximum Size: Systems should aim to produce no more than 100% of the customer’s average annual energy use, based on the past two years of Azusa Light and Water billing records.
Limited Usage History: If the customer account has less than two years of history, the average will be based on available data. Systems can exceed 100% of historic use, but the incentive is capped at the historical usage level.
New Construction: For new builds up to 10 kW, the maximum system size can be estimated at 2 watts per square foot instead of a projected energy load calculation.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- Meter Spot Process
1) Request Meter Spot If a panel upgrade is needed, the Customer/Contractor will need to call them & Water Customer Service at to request a meter spot appointment.
2) Receive Meter Spot Paperwork Azusa Light & Water Electric Crew will determine the location of the panel upgrade with or without the presence of the Customer/Contractor. If the Customer/Contractor wants to meet field personnel at the site, he/she may request that when making a request for meter spot. Field personnel will provide a copy of the paperwork showing the approved location of the panel.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
PM & AC Disconnects need to be within 8 feet of the Main Service Panel (MSP).
AC Disconnect needs to be within 8 feet of the utility meter.
- SLD Reqs
Production meter required (Milbank 125A Ring style Single phase)
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- 626-812-5225
Other details
- Restrict Inspection
- 0
- Address ID
- 108035
- Express Planset Eligible
- No