APU - Anaheim Public Utility

California Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
TOU Utility
0
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

Similar to CA NEM 3.0. Varies by hour and week/weekend between $.059 and $.1409 (as of 1/13/25)

https://anaheim.net/DocumentCenter/View/34968/NEM-20-Excess-Energy-Rate-Sheet-?bidId=

https://www.anaheim.net/5587/NEM-20

Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

**Meter Spot Inspection Request Line** 1. or 2. online: http://www.anaheim.net/FormCenter/Public-Utilities-6/Upgrading-Residential-Panel-Request-Form-52> A utility inspector will contact you within 2-3 business days and provide you with a simple diagram called a meter spot report. Utility Department’s Meter Spot Report must be onsite at the time of the Building Division’s inspection for installation, relocation, or upgrade of the residential electrical service panel. **Meter/Switchgear Under 600 V, up to 200 amps Fee $110.81** **Inspections:** - Once all permits have been issued and the system has been installed, it must be inspected before final approval is granted. On-site inspections can be scheduled by contacting the Building Inspection Request Line or online at www.anaheim.net/building - Inspection requests scheduled by 11:59 p.m. may be scheduled on the following workday. **Inspections Required:** - Electrical Service Meter Code 312 - Electrical Final Code 399

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Please refer to AHJ requirements

SLD Reqs

Please refer to AHJ requirements

Electric Service Reqs

Please refer to AHJ requirements

Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link
Phone
(714) 765-3300

Other details

Restrict Inspection
0
Address ID
108032
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with APU - Anaheim Public Utility before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.