Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Size Justification
- Load Justification
- System Offset Notes
Load Justification Form required if less than 12 months data usage is available.
System Sizing: California law requires that solar systems be sized to provide an amount of energy less than or equal to the annual kilowatt-hour (kWh) use of the building on which they are installed. To figure out your annual kWh usage you can access your previous bills through your online account.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Site Plan: Provide a fully dimensioned site plan showing property lines, all structures, and the arrangement and locations of major equipment including the main electrical service, performance meter socket, AC and DC disconnect(s), inverter(s), combiner boxes, etc. The site plan should show the placement of the arrays; and the route of the wiring connecting different elements of the system.
- DC Disconnect is required (Inverter integrated is not acceptable)
- Elevation Page is required
- SLD Reqs
All Projects:
- See Planset Requirements in files section for examples
- Meter socket required (PV PANEL > DC DISCO > INVERTER > AC DISCO > PERFORMANCE METER) Ring-less sockets are not acceptable
- Draw ELD to show the wires from the AC disco going to the top of PM and the bottom of PM going to the POI.
- DC Disconnect is required for SolarEdge projects. (Inverter integrated Disconnect is not acceptable)
- Equipment Elevation Drawing required: Provide a diagram to show where the photovoltaic system equipment is to be placed on the building structure(s), the height dimensions of the equipment from the ground floor, the clearance dimensions in front of the equipment, and the clearance dimensions from any pertinent obstructions such as: windows and doors, landings, gates and walls, gas meter/lines, crawl spaces, corners, etc. Three Examples include:
- 1) Show performance meter (PM) height requirement at a minimum of 48 in. and a maximum of 75 in. from the ground to the center of the new meter.
- 2) Show a minimum of 36 in. of clearance from the edge of the new performance meter (PM) socket to the nearest gas line.
- 3) Show a minimum of 4 in. of clearance between all solar photovoltaic equipment and to any obstructions.
Battery
- Line Diagram to include an AC disconnect between each POWERWALL and the TESLA gateway. (AC and/or DC disconnects that are built into the inverter are not an acceptable alternative to the required external disconnects. All AC and DC disconnects shall be lever actuated, and lockable in the open position. )
- Electric Service Reqs
Electrical Calculations: Provide electrical calculations for all pertinent solar photovoltaic equipment.
Engineering Calculations: Engineering calculations may be required on some photovoltaic systems to show that the existing roof is strong enough to support the added weight of the system.
- Placards
Signage Specifications: Provide example labeling for photovoltaic system components as described below.
FOLLOW BWP’s SOLAR PHOTOVOLTAIC LABELING REQUIREMENTS CAREFULLY. FAILURE TO DO SO WILL PREVENT SOLAR INTERCONNECTION AND INSTALLATION OF THE NET METER. For labeling questions please contact them’s Test Shop at .
All National Electrical Code, BWP, and Fire Department required labeling will be made of sunlight and weather resistant material. Labeling on disconnects, inverters and service panels will be made of an engraved, plastic material and be permanently attached to its respective device. All labeling shall be red background with white lettering. Unless otherwise specified, the lettering should be 3/8” high, all capital letters, Arial or similar font, non-bold. All labeling shall be attached directly to those pieces of equipment. Labeling for circuit breakers shall be placed directly next to the circuit breaker. Minimize labeling to only what is required. See the Burbank Fire Department Photovoltaic Installation Guidelines for labeling requirements on conduits, raceways, enclosures, cable assemblies, and junction boxes.
The following labels are required where indicated:
• AC disconnects shall be labeled: “AC PHOTOVOLTAIC DISCONNECT”.
• DC disconnects shall be labeled: “DC PHOTOVOLTAIC DISCONNECT”.
• Where DC disconnects are not located near the electrical service, a label stating: “DC DISCONNECT IS LOCATED” and/or post a diagram showing and describing the location of the DC disconnect near the service entrance as required by BWP or City inspectors.
• On the service entrance, a label stating: “PV SYSTEM WARNING - ELECTRIC SHOCK. THIS EQUIPMENT SUPPLIED FROM MORE THAN ONE SOURCE. TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION”.
• At the service entrance and the inverter, if not located at the same location, a label that provides the location and description of the service disconnecting means and the photovoltaic system disconnecting means.
• The circuit breaker(s) in the service entrance panel that connects to the solar photovoltaic system shall be labeled “PHOTOVOLTAIC SYSTEM - DO NOT RELOCATE THIS BREAKER” Plaque to be sized to facilitate placement immediately adjacent to the PV breaker with minimum ¼” horizontal lettering. If there are paralleled inverters then a load center is required between the inverter and the AC disconnect and shall be labeled, “SOLAR SOURCE ONLY. NO OTHER LOADS IN THIS PANEL.”
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (818) 238-3700
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 108090
- Express Planset Eligible
- No