City of Healdsburg

California Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

For the approval of the desired meter-location, please contact the Electric Superintendent at

Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

- All generation must be behind the property’s meters

- Work performed cannot compromise the UL or other safety ratings of the main panel or any other equipment.

- Three-phase customers must balance their load and generation equally among all phases.

Placards

See the file attachment "Labeling Requirements (PDF)"

Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link
Phone
707.431.3346

Other details

Restrict Inspection
0
Address ID
108088
Express Planset Eligible
Yes