LEU - Lodi Electric Utility
Net Metering Allowed0
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
Any unused excess solar generation is sold back to Lodi Electric at the posted EP credit rate. Any energy provided to you from the Lodi Electric grid is charged at the current retail rate.
- Rebates Offered
- 1
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- CSI
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Generation Meter
- AC Disconnect Required
- Yes
- Meter Spot Required
- 1
- Meter Spot Process
- Complete the Service and Meter Application Load/Photovoltaic Information Sheet and submit it with your building permit request.
- Note: A separate permit is required to change out/upgrade an electrical service panel. If work is being done to a main-panel or if the Utility disconnects power, a signed final-inspection of the main-panel from the Building Department is required before the Utility will reconnect power.
- If you have any questions regarding this form please contact them at . Information about LEU and its policies and regulations can be found on our website at www.lodielectric.com
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
- AC Disconnect cannot be more than 10ft away from meter, and must be accessible at all times. If it is behind a fence/gate, it cannot be locked.
Include these notes on ELD:
- Arrow to Disco: ELECTRIC UTILITY DEPARTMENT TO HAVE CONTINUOUS ACCESS TO LOCKABLE DISCONNECT AT ALL TIMES. AC DISCONNECT MUST BE WITHIN 10' (MAX) FROM MAIN SERVICE PANEL AND NOT BEHIND LOCKED GATE. (EES 942 0240)
- Arrow to Disco: AC DISCONNECT SHALL BE LOCK OUT/TAG OUT CAPABLE, SINGLE THROW, DOUBLE POLE AND FUSED. (EES 942 0240)
- Arrow to POI: THE SUM OF THE MAIN CIRCUIT BREAKER AND PV SYSTEM CIRCUIT BREAKER SHALL NOT BE GREATER THAN 120% OF THE MAIN SERVICE PANEL RATING, PER CALIFORNIA ELECTRIC CODE. (CEC 690.64)
- Arrow to Generation Meter: GENERATION METER SOCKET SUPPLIED BY CONTRACTOR. GENERATION METER SUPPLIED BY CITY OF LODI, ELECTRIC UTILITY DEPARTMENT.
- Add in LLH corner: ALL PV SYSTEM SIGNAGE SHALL BE INSTALLED AND LOCATED PER EES 942 0240.
Existing Systems
- only one production meter per address
- Equipment Approvals
- California Energy Commission
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- 209-333-6762
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 108037
- Express Planset Eligible
- No