Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Liberty Utilities (CA)

California Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If you generate more power than you use during a billing period, your account will earn a credit equal to the power exported (measured in kWh). These credits will be rolled over monthly.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Systems must be designed to offset no more than 100% of annual consumption.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Production Meter is required for incentive

A standard meter based socket - (4 jaw)


Temporary Disconnect Reconnect Process (TDR) You will need to contact the planning department and there will be a $50 up/down charge for the service.

TDR - Who to Contact North Lake South Lake

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 48 hours

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Locate the Utility Source disconnect switch within 10' of the Net Meter

Install Reqs

A visible disconnect switch is not required for electric panels that have self contained meters. Electric system isolation can be accomplished by pulling the meter out of the socket. Booting the meter or installing a lockable cover plate will occur during isolation

A visible disconnect switch is required for electric panels where the panel contains metering transformers. The disconnect switch shall be furnished and installed by the customer. The device must be accessible to Utility personnel and be capable of being locked in the open position

Rate Schedule Link
link
Website
link
Phone
(530) 543-5216

Other details

Restrict Inspection
0
Address ID
213280
Express Planset Eligible
Yes