LID - Lathrop Irrigation District
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
WGC allows customers to install solar on their site and use the energy generated from the site to power their home. When the solar panels produce exactly what the customer uses, there will be no energy charges added to the customer’s bill (all applicable fees and taxes will apply and must be paid monthly). During times when the solar panels produce more electricity than the customer uses, the net surplus that flows back to the power grid is credited at the WGC rate - $0.04 cents per kilowatt hour. When the solar panels don’t produce enough power for the customer’s home, WGC customers will pay the same rate as other LID electric customers.
If the energy produced by the system is greater than the energy you are using at that time, then the excess energy produced is credited to that month’s bill at the WGC rate - $0.04 cents per kilowatt hour.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 125
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- It is recommended to size the system below 20 kW AC as going over 20 kW will have longer timeline (at least 6 months) and fee of $1,800.00
- System Offset Notes
- Offset Calc Tool
- CSI
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- Tesla Backup Switch
Plans & docs
- Site Plan Reqs
All Projects
- Production Meter and Disconnect must be located in front of fence for 24 hour access
- SLD Reqs
Existing Systems
- Existing (N) and (E) systems must be combined to share one production meter. This includes battery projects
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- 209-323-5000 ext. 1417
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 110287
- Express Planset Eligible
- No