Pacific Power (CA)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- ConnectDER,Tesla Backup Switch
Plans & docs
- Site Plan Reqs
Show distance from AC Disconnect to Utility Meter (UM).
- CA: within 3 feet from the UM
- OR: within 10 feet from the UM
- WA: within 3 feet from the UM
- SLD Reqs
A one-line diagram showing:
- The location of Utility Meter (UM)
- The location of the disconnect switch
FOR BATTERIES: - ESS DISCONNECT REQUIRED
- Install Reqs
After installation, schedule an appointment to have the Net Meter set by calling.
Submit a photo of the installed placards with Request for Inspection.
- Placards
.
- Website
- link
- Phone
- 1-800-625-6078; 203-813-7496