TDPUD - Truckee Donner Public Utility District
Net metering & export
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- CEC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- 100% offset or recommended maximum 10 kW (whichever is less)
- Customer-Generator Facilities greater than 10kW shall require a dedicated transformer which serves only the Customer.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Questions can be addressed to the District Electric Engineer at
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
AC disco needs to be within 10ft and LOS of utility meter.
- SLD Reqs
6.1. Customer shall or shall cause the design, installation, operation, maintenance and repair of the Equipment, and shall obtain and maintain the required governmental authorizations, permits, and any policy or policies of insurance, as may be required by applicable laws, and this Agreement.
6.2. Customer shall comply with all applicable photovoltaic/solar or wind electrical generating system or battery storage system safety and performance standards established by or under the National Electrical Code (NEC), the Institute of Electrical and Electronics Interconnection Agreement, 4/4/2018 Page | 5 Engineers (IEEE) and accredited testing laboratories, including, without limitation, Underwriters Laboratories (UL), and in accordance with other applicable rules and regulations. The Customer shall comply with the Town of Truckee pertaining to the safety and reliability of electrical generating systems and applicable building codes.
6.3. When references are made to published specifications, codes, standards, or other requirements, it shall be understood that where no date is specified, only the latest specifications, codes, standards, or requirements of the respective issuing agencies which have been published as of the date that the Agreement is signed, shall apply.
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (530) 587-3896
Other details
- Restrict Inspection
- 0
- Address ID
- 108089
- Express Planset Eligible
- Yes