City of Fort Collins

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
TOU Utility
1
Post Solar Billing Method
Net Metering
Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

For customer-owned distributed energy systems, allowable solar generation sizing is determined by compliance with either of these two requirements:

  • Proposed PV system generating capacity is less than 12 kW-DC, or
  • Intended renewable energy offset is less than 200% of the customer’s total annual electric use at the time of interconnection application.


Systems that are not owned by the customer will be limited to an intended renewable energy offset of less than 120%.

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
Tesla Backup Switch,ConnectDER

Plans & docs

Site Plan Reqs
  • Site plans and diagrams showing the physical layout of the Generating Facility and the location of associated structures and infrastructure such as buildings, streets, driveways, water ways, fences, the customer’s generating equipment and the City’s associated distribution system equipment.
  • Utility require a production estimate for each individual array.
  • show all existing equipment
SLD Reqs
  • Single-line diagram of the facility showing the sizes of all equipment and the system protection planned
  • show all existing equipment
Electric Service Reqs

A Single-line and Three-line drawing showing the electrical relationship and descriptions of the significant electrical components such as the primary switchgear, secondary switchboard, protective relays, transformers, generators, circuit breakers, with operating voltages, capacities, and protective functions of the Generating Facility, the customer’s loads, and the interconnection with the City’s distribution system which is typically the City’s transformer.

Site Plan Notes


Rate Schedule Link
link
Website
link
Phone
(970) 221 - 6700

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
108069
Express Planset Eligible
Yes