City of La Junta

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Customer Generated Electricity ~ Any excess will go back to the (LA Junta) Grid.

Customer receives avoided cost as a rebate.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

No offset restriction but for residential projects, it is capped at 10 kW. Commercial projects capped at 25 kW

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

SLD Reqs
  • Production Meter Required
  • Visible lockable AC disconnect
Install Reqs

All plans must include a Production Meter Can

Prior to installing the PV, the AHj/Utility will need to do a Mounting Bracket Inspection. Please ensure that we schedule the mounting bracket inspection, if possible, on the day of our solar installation to prevent multiple trips back to the service address.

Once permit/approval has been received > Install Mounting Bracket > AHJ/Utility inspects Mounting Bracket > Install PV Panels > Schedule Inspection

Equipment Approvals
California Energy Commission
Website
link
Phone
(719) 384-5991

Other details

Restrict Inspection
0
Revision Required
1
Address ID
889237
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of La Junta before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.