City of Yuma
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.02553
- Solar Export Value Notes
- Avoided cost rate is 0.02553 per kWh
- Net Excess Generation Notes
At the end of the billing cycle (usually one month), the utility determines the “net” energy delivered to your home. The “net” is the difference between the amount of electric energy delivered to you and the amount of energy sent to the utility. If the net is toward your home, you pay for that energy as you normally would in your electric bill. If the net is toward the utility, you receive an energy credit to apply to your next month’s bill. At the end of the year, any energy credit remaining is paid to you at the utility’s avoided cost rate
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
Residential up to 10kW, Commercial up to 25kW
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) Email request and address to: Contact staff for TDR request
TDR - Who to Contact Customer Service
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 48 hours
TDR - Who can schedule? N/A
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
The customer is required to install a meter socket that meets the EWS specification between the Inverter and the AC connection to the customer’s load panel. The EWS will cause to be installed an interval recording meter to record net generator power output.
See SLD Sample in File
- Install Reqs
Meter socket for solar, utility will install and provide bi-directional meter.
- Placards
Standard
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (970) 848-3878
Other details
- Restrict Inspection
- 0
- Address ID
- 270702
- Express Planset Eligible
- Yes