DMEA - Delta-Montrose Electric Association

Colorado Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
Post Solar Billing Method
Net Metering
Rebates Offered
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Interconnections of renewable systems are limited in size by the lesser of the amounts listed below:

i. Residential - 25 kW AC; Small Commercial - 50 kW AC; Large Commercial - 250 Kw AC

ii. Nameplate rating of the transformer that serves the net metered system.

iii. The rated continuous capacity of the member’s service entrance capability

****

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(877) 687-3632
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with DMEA - Delta-Montrose Electric Association before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.