Grand Valley Power

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes
  • The generated energy can only offset the energy used at the service on which it is connected, and cannot offset the energy used on another service or account.
  • The meter is read during its normal billing cycle. If the member is a net producer during any month, the member will continue to be billed for the customer access charge and the excess energy will be rolled forward (banked) and available to the member the following month. 
  • Every year in April, the cooperative reviews all net metered accounts. If the member has 4,000 or more banked kilowatt-hours (kWh) at the time of the April billing cycle, the member will receive a check for all excess energy above 1,000 kWh payable at a cost equivalent to the cost of electric energy purchased by Grand Valley Power during the preceding month. 
Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

GVP’s limits on the DC ratings of interconnected system are as follows:

Residential accounts: Maximum of 10 kW DC

Commercial accounts: Maximum of 25 kW or up to 120% of historical annual kWh usage, not to exceed 100 kW.

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Install Reqs

The Interconnection Customer shall provide a lockable AC disconnect switch for the required interactive connection to the Utility’s power system and as such shall be labeled “Utility Disconnect Switch”.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(970) 242-0040

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
173594
Express Planset Eligible
Yes