Gunnison County Electric Association
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
"Option A - Annual True-up. The consumer may elect an annual billing true-up period ending in either March
or September. Annually, within sixty (60) days after the end of the applicable annual billing true-up period,
or within sixty (60) days after the C-G terminates its retail service, GCEA shall account for any accrued excess
energy generation, expressed in kilowatt-hours, for the applicable annual billing period, or portion thereof,
and pay the C-G for such energy at GCEA’s average wholesale energy rate for the applicable billing period, or
portion thereof. The calculation of GCEA’s average wholesale energy rate for the applicable billing period
shall be based on GCEA’s energy cost as billed by the power supplier, divided by the total kWhs purchased
by GCEA. The C-G may choose to change their election from Annual True-up to the Perpetual Rollover option
at least 30 days prior to their annual billing true-up period ending date to be effective starting with the first
day of the subsequent monthly billing period.
Option B - Perpetual Rollover. The C-G may make a one-time election in writing to have GCEA carry forward
the C-G’s excess generation as an energy (kWh) credit from month to month perpetually until the C-G moves
or terminates service, at which time no payment shall be made by GCEA for any remaining excess energy
balance. Energy credits may not be transferred between GCEA accounts or to a new owner if a C-G moves.
The Perpetual Rollover option is a permanent election and once chosen cannot be changed under any
circumstances."
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 10kW AC and no more than 120% of the average annual consumption.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
SLD not required.
- Electric Service Reqs
state electrical code requirements and inspection
- Website
- link
- Phone
- (970) 641-3520
Other details
- Restrict Inspection
- 0
- Address ID
- 173734
- Express Planset Eligible