Town of Oak Creek

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

At the end of the billing period, the Town will subtract the metered energy that was delivered to the Town’s Electric System from the metered energy which was supplied by the Town. The net positive energy supplied by the customer will be billed at the applicable retail rate. A net positive energy deliver to the Town’s Electric System will be carried forward as a kWh credit to the customer. Any credit balance remaining on May 31st of each year or upon termination of electric service will be settled and paid to the customer within sixty (60) days. Other applicable fees and charges, including the base rate and demand charge of the retail rate, will be billed to the customer.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Can be sized up to 25 kW

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link

Other details

Restrict Inspection
1
Revision Required
1
Address ID
1034445
Express Planset Eligible
Yes