City of Dover Public Utilities
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Average
- Offset Calculation Period
- 24
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The City allows you to build 110% of the customer’s 2 year historical usage. There is a system size cap of 25kW for Residential, 500kW for Commercial, and 100kW for Farm.
The maximum size of the system is based on the 2 years of historical usage data. In order for us to provide you with that information this release form needs to be filled out and sent back to a past project:
https://www.cityofdover.com/media/Electric Department/COD Release Form.pdf
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
- Phone
- (302) 736-7070