Newark Electric Department
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.14
- Net Excess Generation Notes
Summer - $17.50 customer charge $0.1720 per kWh
Winter - $17.50 customer charge $0.1520 per kWh
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Average
- Offset Calculation Period
- 24
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The initial design load shall be the calculated average of the two previous twelve-month periods of actual electric usage at the time of installation of electric generating equipment.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
- Phone
- (302) 366-7000
Other details
- Restrict Inspection
- 0
- Address ID
- 211136
- Express Planset Eligible
- Yes